Run on regulation-aware software. Not on reconciliation.
Downstream operations, regulatory reporting and grid decisions on one system that keeps up with the regulator. We built Downstream ERP for oil and gas and a grid-forecasting agent for utilities.
Regulator request #R-118 needs Q3 throughput by depot. Pulled from the live ledger, reconciled and drafted the response for sign-off.
Operations, finance and compliance on one model, with regulator requests answered in hours and no regulatory backlog.
Generic ERPs don't speak downstream.
Stock, sales and finance reconciled by hand every period.
New rules take months to reach the systems.
Every information request becomes a project.
Demand and grid decisions made on yesterday's data.
Across operations and compliance.
Reconciled by period across systems.
A consultant project each time.
Weeks of data gathering.
Spreadsheet models updated weekly.
Every system runs on the same four steps. This is where we spend the most time on yours.
We sit with the people who do the work and map the logic: rules, exceptions, data and handoffs. You keep the map even if you never hire us.
A working system on your real data and edge cases, assembled from proven cores. Not a slide deck, and not a demo on sample data.
A senior pod embedded in your stand-ups ships it to production on your cloud, with tests, monitoring and a decision ledger from day one.
Your team owns the code, IP and infrastructure. Keep us on a quarterly outcome agreement to evolve it, or don't. There's no lock-in.
We map your regulatory obligations precisely, then ship alongside live operations without interrupting supply.
Live in weeks, not fiscal years.
A typical plan for this starting point. Yours is written week by week in the free mapping session.
- Weeks 0–1Map operations and obligations
Depots, products, pricing, levies and reporting duties.
- Weeks 2–4Prototype the ledger
One operating domain on the Downstream core, with your data.
- Weeks 5–11Ship module by module
Finance, procurement and sales onto the same model.
- Weeks 12–14Regulatory cutover
Reporting live from the new core, and the legacy system retired.
What is one month of the new system worth to you?
Compared with ~10 weeks to production with Logicore. It's your own estimate, and nothing is sent anywhere.
Results from real builds, in our clients' numbers.
An ERP built for downstream — compliance, AI, and seven tight modules.
A grid-forecasting agent that closes the control loop.
Emergency management for a Queensland town — from paper to live ops.
Straight answers before you book.
Straight answers. If yours isn't here, ask a senior engineer directly.
We start from the Downstream ERP core and shape it around your operations and jurisdiction. You own the result.
Only within a safety envelope you define. Our grid agent has had zero envelope breaches, and operators can override any action.
You do: the code, the IP and the infrastructure, in your repositories and your cloud from day one. Logicore's cores are shipped to you as source, not rented back as a platform.
The mapping session is free. A build is one commitment scoped to a production outcome, with mapping, architecture and delivery included, so there's no rate card and no timesheets. Afterwards, an optional quarterly outcome agreement.
Not quite your problem? Every road leads to the same core.
See your first 14 weeks.
Tell us where it hurts and get a week-by-week draft plan instantly. Then a senior engineer turns it into yours in a free 30-minute session.





