Speak to our team+44 20 3769 7682+1 325 244 5212
WORK · QUEENSLAND EMS · PUBLIC SAFETY

Emergency operations, rebuilt for a small city.

A regional Queensland town's emergency coordination was running on radio, paper, and a single whiteboard in the ops centre. We partnered with a regional digital agency to rebuild it as a live operational system — incident intake to decision audit, mobile-first, offline-capable, and resilient through power loss.

Client
Queensland municipal council · NDA
Partners
Regional digital agency
Year
2025
Type
GovTech · Public Safety
Incident types modeled
38
Agencies coordinated
9
Offline capable
Yes
Decision audit
Per-action
Lost incidents
0
001 · The situation

A flood, a whiteboard, and a problem.

The council had a disaster-management team of 12 coordinating 9 agencies through bushfires, cyclones, and floods. Decisions were logged in Word docs after the fact — if at all. Radios worked, but the moment the event was over nobody could reconstruct what happened. We built what they needed: a system that holds up when the infrastructure doesn't.

01

Connectivity disappears during events.

Cyclones took the tower out in 2022. The system had to work offline, sync when back online, and merge cleanly — no lost incidents, no duplicate records.

02

Nine agencies, one event.

Police, fire, ambulance, SES, council, state, federal — nine separate comms channels, one event in the real world. No single operating picture.

03

Audit requirements post-event.

After every major incident, the state review required a decision log to the minute. Nobody had one. Every post-mortem became guesswork.

002 · The shift

A system that holds up when the infrastructure doesn't.

Emergency management tools are built for perfect conditions. Real events aren't. We designed backwards from the worst day: power out, tower down, nine agencies converging, state review on the line. Every architecture choice starts there.

How emergency ops has worked
01
000 call
Written on a notepad
02
Radio dispatch
Nine agencies, nine channels
03
Whiteboard update
Ops centre only
04
Paper-log decisions
If someone remembers to
05
After-action in Word
Weeks later, missing context
Result: Nine separate operating pictures, no decision audit, 2–4 week after-action reports, and a team that lived in fear of the next state review.
How Queensland EMS works
01
Typed incident
38 classes · one form
02
Shared operating picture
All 9 agencies converge
03
Offline-first devices
CRDT + local SQLite
04
Decision ledger
Every action, stamped
05
After-action auto-drafted
<24h to state DMO
Result:One operating picture, per-action audit, <24h after-action reports the state DMO signs off on, and a team that now gets thanked for the post-event briefing instead of dreaded.
003 · System architecture

Offline-first. Mesh-syncing. Audit-grade.

The Sync & Conflict tier is what makes the system real. CRDT-backed local state means every device keeps working when the cloud doesn't — and when connectivity returns, the reconciler merges the whole event vector with no lost actions and no duplicate incidents.

01

Devices · Offline-Capable

Four surfaces, each capable of operating with zero connectivity: the ops centre desktop, the field officer mobile, the SES volunteer tablet, and a read-only summary view for the mayor&apos;s brief.

Ops Centre
Desktop · Map-wall
Field Officer
Mobile · Offline
SES Volunteer
Tablet · Rugged
Mayor Brief
Summary view
02

Sync & Conflict

The heart of the resilience. CRDT-backed state on every device; a durable offline queue; peer-mesh sync over WebRTC when the cloud is unreachable; a reconciler that merges event vectors without losing an action.

CRDT Sync
Conflict-free
Offline Queue
Durable local
Peer Mesh
Device-to-device
Reconciler
Event vector
03

EMS Core

Typed domain services on top. 38 incident classes with known responses. Resource service tracks crews and gear. Dispatch does assignment. Comms bridges radio and SMS into one timeline. Public alerts compose templated messages.

Incident Service
38 classes
Resource Service
Crews · Gear
Dispatch Service
Assignment
Public Alerts
SMS · Web · Signs
04

State & Public

On-device SQLite holds the local truth. Cloud Postgres is the merged canonical state. Feeds push to the QLD DMO and the media broadcast chain. Audit lake keeps immutable decision history for the next review.

Local SQLite
WAL · On-device
Cloud Postgres
When online
State API
QLD DMO
Media Feed
Public broadcast
004 · When the tower falls

Anatomy of a network partition.

A real cyclone scenario. The tower drops at 18:42. Three devices keep working locally, peer-sync over mesh, and merge back to the cloud when connectivity returns — with every action preserved and the timeline intact.

01
PARTITION · LOCAL WRITES
Cyclone Ilsa · Tower down 18:42

Ops centre opens Incident #184 at 18:45 and dispatches SES-2. Field officer marks SES-2 on-scene at 18:51. SES volunteer logs an evacuation of 4 residents at 18:57. All three devices writing to local CRDT state. No cloud.

Everything continues. Nothing lost. Each device carries the partial truth of what it saw during the partition.
02
MESH · RECONCILE
// 19:04 · backhaul returns
// fetch vector clocks from all peers:
const local  = automerge.load(localDoc);
const ops    = peers["ops-laptop-01"];
const field  = peers["field-tablet-14"];
const ses    = peers["ses-tablet-07"];

const merged = Automerge.merge(
  Automerge.merge(
    Automerge.merge(local, ops),
    field,
  ),
  ses,
);
// no lost ops · no duplicates
// 3 partial truths → 1 timeline
persist(merged); flush(auditLog);
Automerge CRDT + vector clocks. Mathematically guaranteed: concurrent edits merge without conflict. No manual reconciliation.
03
TIMELINE · UNIFIED
18:45Ops · Open #184
18:45Ops · Dispatch SES-2
18:51Field · SES-2 on-scene
18:57SES · 4 evacuated
19:04Mesh reconciled · 22 min partition
Auditau_ilsa_184
One timeline. No gaps. The state DMO gets this document the morning after — not the month after.
005 · End-to-end flow

From 000 call to after-action report.

Six steps. Every one captured, timestamped, and preserved. The team gets to focus on the event — the system handles the paperwork afterwards.

  1. 01

    Incident Reported

    ONE-TOUCH

    Called in by public, sensor, or partner agency. Typed by incident class — 38 known response profiles.

  2. 02

    Resource Match

    SUGGESTED

    System proposes crews, gear, and routes. Ops centre approves or overrides with a single key.

  3. 03

    Dispatch & Mesh

    OFFLINE-OK

    Assignment pushed to field devices; syncs via peer mesh if the backhaul is down. Nothing stops.

  4. 04

    Live Coordination

    PER-SECOND

    Every agency&apos;s picture converges on one operating view. Every decision logged with actor and timestamp.

  5. 05

    Public Comms

    PIO-APPROVED

    Auto-drafted alerts approved by PIO; fan out to SMS, web, and roadside signage in one action.

  6. 06

    After-Action

    AUDIT-GRADE

    Decision stream replayed into a timed report. State DMO receives it within 24 hours of incident close.

006 · Capabilities

Six capabilities. Built for the worst day.

Every feature was specified backwards from a single question: “Does this still work when the tower's down and the state DMO is on the phone?”

01

Offline-First

The tower falls. Nothing stops.

CRDT-backed local SQLite on every device. Every action keeps being logged, every record keeps being updated, whether or not the cloud is reachable.

Automerge CRDTSQLite WALDurable queue
02

Peer Mesh Sync

Device-to-device when the cloud is gone.

Devices sync to each other over WebRTC when the backhaul is down. Local WiFi or Bluetooth is enough — the ops centre, field officer, and SES volunteer stay in lockstep.

WebRTCPeer discoverySigned payloads
03

Decision Ledger

Who decided what, when.

Every decision — who made it, at what time, with what information — is written to an immutable stream. No after-the-fact reconstruction. No gaps the state reviewer can find.

Append-only WALPer-actor signatureTimestamp ordering
04

One Operating Picture

Nine agencies. One map.

Police, fire, ambulance, SES, council, state, federal — every agency converges on one live operating view. No more phone-call coordination with nine different agencies.

Shared CRDT docRole-filtered viewsMapLibre
05

Auto Public Alerts

PIO approves. Fanout in 90 seconds.

Templated alerts drafted automatically from the incident state. PIO reviews on one screen and one click fans out to SMS, web, and roadside signage.

Template enginePIO gateMulti-channel
06

Same-Day After-Action

Report writes itself.

Replay the decision stream into a timed report. State review gets it the next morning — with every actor, every decision, and every public alert in order.

Event replayDMO-format exportImmutable source
007 · Outcomes

2025 cyclone and flood season. Zero lost incidents.

Measured across an entire active season on the east coast. The state DMO flagged the council's after-action process as a reference implementation — and has quoted the timeline on two subsequent reviews.

Lost incidents
0
since launch
Time to after-action
−96%
weeks → hours
Coordination calls
−72%
replaced by shared view
Public alert latency
<90s
from draft to broadcast
Uptime during storms
100%
offline-capable
008 · The stack

What we built it with.

Rust for the core — memory-safe, no surprise crashes in a system that runs during cyclones. Automerge for CRDT sync. WebRTC for peer mesh. TimescaleDB for the timeline. IRAP-aligned controls on Australian-region AWS.

01

Frontend

  • Next.js 16
  • React Native
  • MapLibre
02

Sync

  • Automerge CRDT
  • WebRTC mesh
  • SQLite WAL
03

Backend

  • Rust
  • Actix
  • NATS
04

Data

  • Postgres
  • TimescaleDB
  • S3 Object Lock
05

Infra & Controls

  • AWS ap-southeast-2
  • IRAP-aligned
  • Bureau of Met feed
009 · OUTCOME
For the first time, the after-action report wrote itself. The state DMO asked us how we did it — we said we built the system around the question they were going to ask.
— Disaster Management Coordinator, Queensland council (NDA)

The council's emergency operations went from paper and radio to a mesh-synced, audit-grade system that holds up when the infrastructure doesn't. Delivered in partnership with a regional digital agency who owned the on-ground implementation — the right local hands, the right architecture, the right outcome.

Build with us

Want a case study with your name on it?
Let's start the conversation.

Tell us what you're trying to build. We'll be honest about what's hard, what's worth it, and whether we're the right partner for the job.

30-minute call·Written audit within 5 days·No slide deck